JAGARAN TRIPURA
বাংলা
  • Home
  • Tripura
  • Editor’s Choice
  • Nation
  • North East
  • International
  • Sports
  • Entertainment
  • Business
  • Health
  • Tender/ EOI
  • Home
  • Tripura
  • Editor’s Choice
  • Nation
  • North East
  • International
  • Sports
  • Entertainment
  • Business
  • Health
  • Tender/ EOI
No Result
View All Result
Jagaran Tripura
No Result
View All Result
Home North East

World Bank cuts Nepal growth forecast as floods disrupt economy

News Desk by News Desk
October 6, 2026
in North East
0
Share on FacebookShare on Twitter

Kathmandu, Oct 6 (IANS): The devastating August floods in Nepal are expected to have a material negative impact on the country’s economic prospects in the short term, the World Bank said on Tuesday as it lowered its economic growth projection for the Himalayan nation.

The global development lender said Nepal’s economic growth is projected to slow to 3.7 per cent in the current fiscal year 2026-27, which began in mid-July, from the 4.2 per cent projected in April, reflecting disruptions to industry and services.

READ ALSO

Gujarat CM attends event as 6,500 students form ‘Human Rangoli’ in Ahmedabad

Kaziranga records 4.58 lakh tourists in 2025-26; footfall rises 8.5 pc

In its report titled Nepal Development Update: Building Back Differently for the Future, released on Tuesday, the World Bank said the August 2026 floods are expected to affect Nepal’s economy through four primary transmission channels: energy, transportation, trade and tourism.

“Agriculture and banking and insurance are also channels through which the economy would be affected, but with relatively lower potential impact,” it said.

According to the bank’s report, energy, particularly hydropower, is the most critical transmission channel. The floods affected 12 hydropower projects, including seven operational projects with a combined capacity of 256.1 MW and five projects under construction with a combined capacity of 395.02 MW, as well as a 25 MW solar facility.

“Damage to transmission infrastructure disrupted an additional 149.6 MW, bringing total affected generation and transmission capacity to approximately 430.7 MW, equivalent to 10.6 per cent of Nepal’s FY26 installed hydropower and solar capacity,” the bank said.

Transportation and trade are other key transmission channels, given the concentration of Nepal’s international and domestic trade along a limited number of corridors, according to the World Bank.

As many as 1,455 people have been confirmed dead and 5,285 remain missing to date following the disaster, which destroyed communities and infrastructure along the Bhotekoshi and Trishuli river corridors, according to the National Disaster Risk Reduction and Management Authority.

According to the Rapid Disaster Needs Assessment (RDNA) report prepared by a joint technical team of the National Planning Commission and the National Disaster Risk Reduction and Management Authority, the recent floods are estimated to have caused physical damage worth 274.48 billion Nepali rupees (about 1.93 billion US dollars), while overall losses and damages have reached 408.28 billion rupees (about 2.87 billion US dollars).

The preliminary assessment suggests that more than 723 billion rupees will be required for the reconstruction and recovery of affected infrastructure and assets. The Nepali government is now working on a Post-Disaster Needs Assessment involving a more extensive assessment of the damage.

The World Bank said industry is expected to be the main drag on growth, reflecting extensive damage to hydropower, solar energy, electricity transmission and transport infrastructure, which will constrain electricity generation and production and disrupt the movement of goods.

“For instance, it took nearly a year to fully restore generation at the 111 MW Rasuwagadhi Hydropower Project, which was severely damaged by the July 8, 2025, Bhotekoshi (Lhende River) flood,” it said.

The same project has once again been badly affected by the August floods.

“This illustrates the potential for flood-related damage to disrupt electricity supply and impose substantial reconstruction costs,” the global development lender said.

“Hydropower construction in areas not directly affected by the flood is expected to continue, although projects could face higher insurance premiums, financing reassessments, and cost overruns,” it added.

“Services are expected to be affected through disruptions to trade, transport, tourism, and financial activity, while agricultural losses are expected to have limited effects on aggregate output but significant impacts on livelihoods in affected areas,” the bank said in the report.

Tourism is expected to face a potentially prolonged impact, reflecting both physical disruptions and heightened perceptions of travel risks, according to the report.

It said more than 200 hotels and restaurants were damaged across the affected districts, while access to major trekking and pilgrimage destinations—including Langtang, Gosaikunda and the Kailash Mansarovar corridor—has been disrupted.

However, economic activity is expected to gradually recover in fiscal year 2027-28 as reconstruction activity begins to gain momentum and damaged infrastructure and productive capacity are progressively restored, the bank said.

Related Posts

Gujarat CM attends event as 6,500 students form ‘Human Rangoli’ in Ahmedabad
North East

Gujarat CM attends event as 6,500 students form ‘Human Rangoli’ in Ahmedabad

October 6, 2026
Kaziranga records 4.58 lakh tourists in 2025-26; footfall rises 8.5 pc
North East

Kaziranga records 4.58 lakh tourists in 2025-26; footfall rises 8.5 pc

October 6, 2026
Nepal Home Minister Sudan Gurung to visit India next week
North East

Nepal Home Minister Sudan Gurung to visit India next week

October 6, 2026
Assam bypoll: Voting underway in Nagaon LS seat; brief EVM glitch reported at Morigaon Booth
North East

Assam bypoll: Voting underway in Nagaon LS seat; brief EVM glitch reported at Morigaon Booth

October 6, 2026
Assam civic poll: Counting underway for 40 wards in Silchar
North East

Assam civic poll: Counting underway for 40 wards in Silchar

October 6, 2026
First cargo vessel leaves Dibrugarh via river route to Bangladesh after Independence
North East

First cargo vessel leaves Dibrugarh via river route to Bangladesh after Independence

October 5, 2026
Next Post
Journalists attacked at Bangladesh university; sparks widespread condemnation

Journalists attacked at Bangladesh university; sparks widespread condemnation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Amit Shah flags off India’s first LNG-powered train from Sabarmati

Amit Shah flags off India’s first LNG-powered train from Sabarmati

September 27, 2026
Tripura HC directs speedy filling of 1,116 PG, 2,193 Graduate Teacher Posts

Tripura HC directs speedy filling of 1,116 PG, 2,193 Graduate Teacher Posts

September 11, 2026
No separate census data for ‘Tripura’ Tribe, mother tongue to be recorded

No separate census data for ‘Tripura’ Tribe, mother tongue to be recorded

September 17, 2026
Former Congress MLA Tapas Dey Passes Away, Pradyot Calls for Half-Masting of TMP Flags

Former Congress MLA Tapas Dey Passes Away, Pradyot Calls for Half-Masting of TMP Flags

September 12, 2026
Kailashahar Airport revival depends on Airline interest, 205 acres sought for expansion : K M Nehra

Kailashahar Airport revival depends on Airline interest, 205 acres sought for expansion : K M Nehra

September 16, 2026

EDITOR'S PICK

J&K: Medical interns launch indefinite strike over stipend hike demand

J&K: Medical interns launch indefinite strike over stipend hike demand

September 6, 2026
Pakistani authorities offered detained Baloch activists option of settling in Europe

Pakistani authorities offered detained Baloch activists option of settling in Europe

September 24, 2026
Bhagyashrii Borse tells Mohanlal: To be your co-actor feels like a blessing!

Bhagyashrii Borse tells Mohanlal: To be your co-actor feels like a blessing!

October 1, 2026
Siddaramaiah meets Rahul Gandhi, raises K’taka Cabinet vacancy, caste census implementation

Siddaramaiah meets Rahul Gandhi, raises K’taka Cabinet vacancy, caste census implementation

September 11, 2026

About

JAGARAN TRIPURA

News that belongs to you. Not of any individual, but of every citizen of the nation. Every issue faced by the people is our priority. Without bias or favour, our sole responsibility is to bring every important story to the public.

www.eng.jagarantripura.com — With the news, with the people, and with a commitment to contributing to the progress of the nation.

Follow us

Archives

Calendar

October 2026
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031  
« Sep    

Contact Us

www.jagarantripura.com
Jagaran Bhawan, Ground Floor
L. N. Bari Road(Prabhaburi)
Banamalipur, Agartala, Tripura(W)
Ph : +91-381-7960883
M : 9436123720
Email : jagarantripura@gmail.com

  • Home
  • Tripura
  • Editor’s Choice
  • Nation
  • North East
  • International
  • Sports
  • Entertainment
  • Business
  • Health
  • Tender/ EOI

© 2026 Jagaran Tripura

No Result
View All Result
  • Home
  • Tripura
  • Editor’s Choice
  • Nation
  • North East
  • International
  • Sports
  • Entertainment
  • Business
  • Health
  • Tender/ EOI

© 2026 Jagaran Tripura

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?